Panama Canal Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.Anti-spam check. Do not fill this in! ===Capacity=== The canal handles more vessel traffic than had ever been envisioned by its builders. In 1934 it was estimated that the maximum capacity of the canal would be around 80 million tons per year;<ref>{{Cite book |url=http://www.czimages.com/CZMemories/thirdlocks/tlpage3.htm |title=The Land Divided—A History of the Panama Canal and other Isthmian Canal Projects |first=Gerstle |last=Mack |year=1944 |access-date=January 7, 2006 |archive-date=May 1, 2013 |archive-url=https://web.archive.org/web/20130501112749/http://www.czimages.com/CZMemories/thirdlocks/tlpage3.htm |url-status=live }}</ref> as noted above, canal traffic in 2015 reached 340.8 million tons of shipping. To improve capacity, a number of improvements have been made to maximize the use of the locking system:<ref name="3rdLockProposal"> {{cite web |url=http://www.acp.gob.pa/eng/plan/documentos/propuesta/acp-expansion-proposal.pdf |title=Proposal for the Expansion of the Panama Canal |date=24 April 2006 |publisher=Panama Canal Authority |url-status=dead |archive-url=https://web.archive.org/web/20110721055325/http://www.acp.gob.pa/eng/plan/documentos/propuesta/acp-expansion-proposal.pdf |archive-date=2011-07-21 |page=45}} </ref> * Implementation of an enhanced locks lighting system; * Construction of two tie-up stations in Culebra Cut; * Widening Culebra Cut from {{convert|192|to|218|m|ft|sp=us}}; * Improvements to the tugboat fleet; * Implementation of the carousel lockage system in Gatun locks; * Development of an improved vessel scheduling system; * Deepening of Gatun Lake navigational channels from {{convert|10.4|to|11.3|m|ft|sp=us}} PLD; * Modification of all locks structures to allow an additional draft of about {{convert|1|ft|m|sp=us|order=flip}}; * Deepening of the Pacific and Atlantic entrances; * Construction of a new spillway in Gatun, for flood control. These improvements enlarged the capacity from 300 million PCUMS (2008) to 340 PCUMS (2012). These improvements were started before the new locks project, and are complementary to it. Summary: Please note that all contributions to Christianpedia may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here. You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see Christianpedia:Copyrights for details). Do not submit copyrighted work without permission! Cancel Editing help (opens in new window) Discuss this page